top of page

Excerpt: 

 

tctm.00\MAP.r.07

 

Velho Clockwork Bridge

 

All Ramps, Slides, Transfer Points, and Funiculars are geared to operates in clockwork unison. conveyor belts. Driving on treadmilled platforms turns the gears that are connected through a system of chains, cables, and pulleys. The vehicle on the treadmill platform must maintain a slow steady speed to stay in place on the platform but provide enough power for the platform to move to the next location. The vehicle must speed up to leave the platform but stop in time to not go off the end of the next platform. All platforms are only large enough for a single truck that is within weight tolerances. 

 

In an attempt to maximize the momentum of the Clockwork, Red Repair has devised a plan to make the bridge crossing faster by using a technique they call Ramping Speed. Vehicle increases speed until almost running off the front of a platform, stopping to let the conveyor belt carry the vehicle back until it almost falls off the rear of the platform, then racing the vehicle to the front of the platform again. Repeating the process increases the speed of the bridge’s moving components.

 

 

The step-by-step procedure for crossing on the Velho Clockwork Bridge from Sweet Misery across to Down Side.

 

Step 1: Starting on the Sweet Misery On Ramp, Sliding Platform 1 takes the vehicle to either Funicular 1A or 1B as available.

Step 2: Funicular 1 descends to Sliding Bridge 2.

Step 3: Sliding Bridge 2 takes the vehicle to either Funicular 2A or 2B as available.

Step 4: Funicular 2 descends to the Down Side Off Ramp.

Reverse the process for going from Down Side up to Sweet Misery.

 

]Whether caused intentionally or otherwise, data stream integrity is severely compromised during hostile exchanges. Fortunately, the ch2 retrieval team was able to decrypt a “battle schematic” and key code. The battle schematic sets the overlapping pattern for the repair vehicles to cross as quickly as possible.

 

            Along with the very small volume of recoverable visual and aural material, the battle schematic was input into Otto’s Educated Guess for simulation of Red Repair’s dangerous river crossing as a real-time event.  

Red Repair Battle Schematic.

Key Code:

 

RV 1-6 – Repair Vehicles 1 through 6

Os = Operating Speed     

 

Ex =Exit speed    

 

Rs = Ramp Up Speed

 

Wn = Weather Nominal, exceed safety                       parameters.

 

Wm = Weather Moderate, exceed safety                      parameters

 

Wu = Weather Unpredictable, use caution

 

Wx = Weather Extreme, use discretion

 

SMD = Sweet Misery Defense     

 

DSD = Down Side Defense

Bridge Codes:

Ra = Sweet Misery Ramp to S1

S1 = Sliding Platform one. Travels from Ra to F1a or                 F1b

F1ab = Funicular One, Cars a or b. Takes vehicles down           to S2

S2 = Sliding Platform. Travels from F1ab to F2ab

F2ab = Funicular Two, Cars a or b. Travels from S2 to                   Rb

Rb =Exit Ramp to the town of Down Side. 

Red Repair Battle Schematic as Executed

 

I

{Deploy Repair Ground Crew across entire rail span.}

◊  [RV1 S1 to F1a / Wn Rs]  

 ◊  RV2-6,8 SWD

 

     II

     ◊  [RVØ S1 to Ra / Wn Os]  

      ◊  [RV1 F1a to S2 / Wn Rs] 

       ◊  RV3-6,8 SWD

 

          III

          ◊  [RV2 S1 to F1b / Wn Rs]   

           ◊  [RV1 F1a to S2 / Wn Rs]  

            ◊  RV3-6,8 SWD

 

               IV

               ◊  [RVØ S1 to Ra / Wn Os]                        

                ◊  [RV2 F1b to S2 / Wn Rs]

                 ◊  [RV1 S2 to F2a / Wn Rs]

                   ◊  RV3-6,8 SWD

 

                    V

                    ◊  [RV3 S1 to F1a / Wn Rs]

                     ◊  [RV2 F1b to S2 / Wn Rs]

                      ◊  [RVØ S2 to F1 / Wn Os]  

                       ◊  [RV1 F2a to Rb / Wn Rs]

                        ◊  RV4-6,8 SWD

 

                         VI

                         ◊  [RVØ S1 to Ra / Wn Os]

                          ◊  [RV3 F1a to S2 / Wn Rs]

                           ◊  [RV2 S2 to F2b / Wn Rs] 

                           ∆  XFER FAILURE  *RV2

                            ◊  [RVØ S2 to F1a / Wn Os]  

                             ◊  [RV1 F2a to Rb / Wm Rs]

                              ◊  RV5-6,8 SWD  

 

                              VII

                              ◊  [RV5 S1 to F1a / Wn Rs]  

                               ◊  [RV4 F1b to S2 / Wn Rs]

                                ◊  [RV3 F1a to S2 / Wn Rs]

                                 ◊  [RVØ F2b to Rb / Wm Rs] *RV2

                                  ◊  [RV1 Rb to DS / Wm Rs<EX]                             

                                   ◊  RV5-6,8 SWD  ◊  RV1 DSD

 

                                      VIII

                                      ◊  [RVØ S1 to Ra / Wm Os]

                                       ◊  [RV4 F1b to S2 / Wm Rs]

                                        ◊  [RV3 S2 to F2a / Wm Rs]

                                         ◊  [RVØ S2 to F1 / Wm Os]

                                          ◊  RV5-6,8 SWD  ◊  RV1 DSD

 

                                            IX

                                           ◊  [RV5 S1 to F1a / Wm Rs]  

                                            ◊  [RV4 F1b to S2 / Wm Rs]

                                             ◊  [RVØ S2 to F1 / Wm Os]

                                              ◊  [RV3 F2a to Rb/Wu Rs]

                                               ◊  RV6,8 SWD  ◊  RV1 DSD

 

                                                 X

                                                ◊  [RVØ S1 to Ra / Wm Os]

                                                 ◊  [RV5 F1a to S2 / Wm Rs]

                                                  ◊  [RV4 S2 to F2b/Wu Rs]  

                                                   ◊  [RV3 F2a to Rb/Wu Rs]

                                                    ◊  RV6,8 SWD  ◊  RV1 DSD

 

                                      XI

                                      ◊  [RV6 S1 to F1a / Wm Rs]

                                       ◊  [RV5 F1a to S2 / Wm Rs]

                                        ◊  [RVØ S2 to F1/Wu Os]

                                         ◊  [RV4 F2b to Rb / Wu Rs]

                                          ◊  [RV3 Rb to DS / Wu Rs<EX]                              

                                           ◊  RV8 SWD  ◊  RV1,3 DSD

 

                                 XII

                                 ◊  [RVØ S1 to Ra / Wu Os]

                                  ◊  [RV6 F1b to S2 / Wu Rs]

                                    ◊  [RV5 S2 to F2a/Wu Rs]

                                     ◊  [RV4 F2b to Rb / Wu Rs]

                                      ◊  RV8 SWD  ◊  RV1,3 DSD

 

                              XIV

                              {Withdraw Rail Repair Crew concurrent with RV8 movement}

                              ◊  [RV8 S1 to F1b / Wu Rs]

                               ◊  [RV6 F1b to S2 / Wu Rs]

                                ◊  [RVØ S2 to F1 / Wu Os]  

                                 ◊  [RV5 F2a to Rb / Wu Rs] 

                                  ◊  [RV4 Rb to DS / Wx Rs<EX]                               

                                   ◊  RV1,3,4 DSD

 

                         XV

                         ◊  [RV8 F1b to S2 / Wu Rs]

                          ◊  [RV6 S2 to F2b / Wx Rs]

                           ◊  [RV5 F2a to Rb / Wx Rs] 

                            ◊  RV1,3,4 DSD

 

                    XVI

                    ◊  [RV8 F1b to S2 / Wx Rs]

                     ◊  [RVØ S2 to F1 / Wx Os]  

                      ◊  [RV6 F2b to Rb / Wx Rs]

                       ◊  [RV5 Rb to DS / Wx Rs] 

                      ∆  XFER FAILURE

                        ◊  ∆ [RV5 F2a to S2 / Wx Os] 

                         ◊  RV1,3,4 DSD

 

                XVII

                ◊  [RV8 S2 to F2b / Wx Os]

                 ◊  [RV6 F2b to Rb / Wx Os]

                  ∆ ◊  [RV5 F2a to S2 / Wx Os] 

                   ◊  RV1,3,4 DSD

 

           XVIII

           ∆ ◊  [RV5,8 F2b to Rb / Wx Os]

            ◊  [RV6 Rb to DS / Wx Os<EX]                                   

             ◊  RV1,3,4,6 DSD

 

     XIX

     ∆ ◊  [RV5,8 F2b to Rb / Wx Os]

      ◊  RV1,3,4,6 DSD

 

XX

{Retrieve Rail Repair Crews}                    

◊  ∆  [RV5,8 Rb to DS / Wx Os<EX]                           

◊  RV1,3,4,5,6,8 DSD

For those who don’t read Repair Marks that was pretty intense. This was like visualizing the chess notations of a championship match, or the gut wrenching experience of stock market ticker symbols on a volatile day, or the exhilaration of finding hidden wealth by correctly interpreting the morning line on a horse race. It’s stats with consequences. 

bottom of page